Page 20 - Layout 1
P. 20
City Infrastructure
C Current District I
Water & Sewer Projects
By Commissioner Heather Moraitis
Coral Ridge Club Estates Pump Station
The project includes the rehabilitation of Mainline Sewers, This project is for the replacement of station pumps, valves,
point repairs, minor road restoration and landscaping, the suction and discharge piping, re-route of discharge
use of trenchless technologies to repair sewer system forcemain, new sump pumps, ladders, grates and hatches;
components such as lining of gravity sewers, manholes, new HVAC and electrical and control system. The work
and sewer laterals. Work also includes pre and post also includes repairs to the wet-well, and structural repairs
television survey, flow monitoring, traffic control and site to the station.
restoration. This is part of the WW Conveyance System Security Gate Replacement
Long Term Remediation Program.
Replacement of electronic entrance security gate at the
Bermuda Rivera 38th Street Public Works Administration facility.
This project is for the relining of sanitary sewer collection Lake Estates
mains and laterals. It includes the rehabilitation of mainline This project is for small water main improvements in Lake
sewers, point repairs, minor road restoration and Estates. This project will replace existing water mains,
landscaping, the use of trenchless technologies to repair which are undersized and deteriorated, with approximately
sewer system component.
7,000 linear feet of 6" water mains.
Basin
Rehab of 2 SCADA High Service Pump
Sanitary Sewer Collection System Rehabilitation- Basin B-6 This Project is to rehabilitate control panels that regulate
(Coral Ridge area) relining of sanitary collection mains and and operate three of the Fiveash high service pumps. These
laterals and rehabilitation of manholes.
panels have exceeded their service life.
18 The Landings & Bay Colony