Fiveash Water Treatment Plan Facility
                                                              Concrete Restore
                                                              This project is to assess the concrete surfaces and structures
                                                              at the Water Treatment Plants for failures. The work will
                                                              create the bid specs for concrete repairs, oversee the bid
                                                              process, and the construction inspection services.
                                                              Utilities Storage Building
                                                              This project is to construct a prefabricated steel building
                                                              such as a "Butler" building to store equipment and
                                                              materials for use in utilities projects. The pipe yard/depot
                                                              at the Public Works compound is at its maximum capacity.
                                                              There are no available covered storage spaces to keep
                                                              components out of the weather.

                                                              Peele Dixie R&R
                                                              Peele-Dixie Treatment Plant - renewal and/or replacement
                                                              of miscellaneous equipment, structures, pipes and other
                                                              features critical to the continued safe, reliable, efficient,
                                                              and compliant operation of the plant.

                                                              Coral Ridge Isles
                                                              The project includes the rehabilitation of the sanitary sewer
                                                              collection system throughout Basin B-13. This includes, but
                                                              not limited to point repairs, minor road restoration,
                                                              landscaping, the use of trenchless technologies to repair
                                                              sewer system components such as lining of gravity sewers,
                                                              manholes, and sewer laterals. Work also includes pre and
                                                              post television survey, flow monitoring, traffic control and
                                                              site restoration.

        Water Distribution Service
        This project will replace the existing Water Pressure
        SCADA system with a new system that will monitor water
        system pressure, chlorine residual, pH, turbidity and
        conductivity. This system will interface with the existing
        water plant control system and have the data recorded.
        Eight new panels will be installed at various locations in
        the city's water distribution system.
        Fiveash Water Treatment Plant
        Disinfection Improvements                                   The City of Fort Lauderdale Public Works
        The Fiveash Reliability Upgrades (P11593 & P10508)        Department has launched "Go Big, Go Fast!”
        project was added to the Disinfection System Replacement
                                                                 a comprehensive initiative designed to improve,
        project (P11589) for bidding and construction, so that one  upgrade, and enhance our City's wastewater
        contractor will be responsible for use of the limited free
                                                                     system, strengthen our infrastructure, and
        spaces at the plant. Both projects will be constructed at the
        same time.                                                   move us closer to achieving our shared
                                                                       community-wide vision of becoming
        Fiveash Water Treatment Plant Hydrotreators                   “The City You Never Want To Leave.”
        This project includes the replacement of 30" diameter steel
        fabricated flagned fitting and associated valves and              For the latest project updates
        couplings, replacement of air release valves, replacement          (issued weekly), please visit
        of sump pump and associated piping for Hydrotreators 3 &      www.fortlauderdale.gov/gobiggofast.
        4 at the Fiveash Water Treatment Plant.